Joists2x8 @ 16" OC · span 11.0'
Beam(2) 2x12
Posts3 × 6x6 @ 8.0'
Footings3 × 16" poured pier
Ledger1/2" lag screw @ 15" OC
Hardware13 hgr · 13 ties · 3+3
✓2x8 @ 16″ OC spans 11.0' — within the 11.8' limit
Guardrail code-required — surface over 30″ above grade
One-time unlock for this design